The Village at Manor Park Renovation

Bid Due Date | November 12, 2025 2:00 PM


Project Description

The project consists of a 100,179 sf renovation to the existing building.

There is a pre-bid meeting scheduled on November 5th at 10:00 AM at the jobsite. Attendance is not mandatory but it is recommended.

The work includes selective demolition, structure demolition, asbestos abatement, earthwork, asphalt paving, site concrete, unit pavers, landscaping & irrigation, site utilities, cast-in-place concrete, unit masonry, stone, structural and miscellaneous steel, millwork, interior architectural woodwork, dampproofing, air barriers, standing seam roofing, TPO roof patching, firestopping, joint sealants, expansion joint cover assemblies, doors/frames/hardware, integrated metal door opening assemblies, automatic entrances, aluminum entrances & storefront, curtain wall, gypsum board assemblies, tile, acoustical ceilings, specialty ceilings, fluid applied athletic flooring, resilient flooring & carpet, resinous flooring, resilient athletic flooring, fabric wrapped panels, ultracompact wall finishes, wall coverings, painting, operable partitions, toilet compartments and accessories, corner guards, fire protection specialties, lockers, manufactured canopies, flagpoles, residential appliances, kitchen equipment, fitness and athletic equipment, fire sprinklers, plumbing, HVAC, electrical, audio/visual, access control, security (cameras by owner), communications and fire alarm.


Location

Midland, TX

Plans

2025_10_17 Manor Park Phase 1 Renovation Construction Documents (sealed)

 

Specifications

Vol 1 of 3 – Manor Park Specs

Vol 2 of 3 – Manor Park Specs

Vol 3 of 3 – Manor Park Specs

 

General Information

Bid Invitation Manor Park Phase 1 Renovation

MCP Group Supplemental Conditions

 

Addenda

Addendum 001_Combined