Bid Due Date | September 3, 2025 2:00 PM
Project Description
This project features new construction of 3 24 -unit, 3-story Apartment Buildings with one attached clubhouse. ALL scopes of work are needed. They include but are not limited to, Site Demolition, Earthwork, Site Utilities, Landscaping & Irrigation, Striping, ADA Signage, Cast-In-Place Concrete, Masonry Veneer, CMU, Structural Steel, Misc. Metals, Railings, Rough Carpentry Labor, Framing Materials, Insulation, Caulking, Metal Flashing and Trim, Roof Accessories, Siding, Asphalt Shingle Roofing System, Vinyl Windows, Window Coverings, Aluminum Storefront and Glazing, Doors, Frames and Hardware, Finish Carpentry Labor, Wire Shelving, Drywall, Flooring, Carpet, Painting, Restroom Accessories, Fire Extinguishers, Postal Specialties, Aluminum Fencing, Appliances, Fire Sprinkler, Plumbing, HVAC, Electrical, Low Voltage and Fire Alarm.
Location
Brownsville, TNThis project requires compliance with Section 3 regulations in 24 CFR Part 75.
Project is not subject to Davis-Bacon wage requirements, and is not tax-exempt.
Plans
3446-Reserves-at-Cobalt-Circle-ARCH-Permit-Set-5-9-25
3446-Reserves-at-Cobalt-Circle-CIVIL-Permit-Set-5-9-25
3446-Reserves-at-Cobalt-Circle-LANDSC-Permit-Set-5-9-25
3446-Reserves-at-Cobalt-Circle-MEP-Permit-Set-5-9-25
3446-Reserves-at-Cobalt-Circle-STRUCT-Permit-Set-5-9-25
Specifications
3446-Cobalt-Circle-Final-Specs-5.9.25
General Information
PDF Section 3 – ITB -Reserves at Cobalt Cir.
MCP-Supplemental-Conditions.2021
Addenda
Reserves-at-Cobalt-Circle_Addendum-1-6-2-25
Cobalt-Circle-Addendum-2-6-10-25
Cobalt-Circle-Addendum-3-6-12-25