Bid Due Date | June 13, 2023 12:00 PM
Project Description
New Construction of a 124-unit, 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, EIFS, TPO roofing, sheet metal trims and flashings, roof specialties, joint sealers, HM doors and frames, access doors, wood overhead coiling doors, aluminum framed storefronts, aluminum windows, Vinyl windows, glazing, mirrors, louvers, drywall, tiling, acoustic ceilings, resilient flooring, tile carpeting, painting, signage, wall, and door protection, toilet accessories, fire protection, shelving, residential appliances, vertical louver blinds, Drapery, countertops, elevators, sprinkler systems, plumbing, HVAC, electrical, fire alarm, site work, termite control, pavement markings, landscape, irrigation, traffic control, site wet utilities, erosion control, site paving, and retaining wall.
Location
Plano, TXPlans
3 – BID SET – Echo Plano Gateway
5 – Bid Set Plano Gateway COMcheck
Specifications
4 – Bid Set Project manual – Echo Plano Gateway
7 – ECHO Appliance Package — 5.12.23
General Information
6 – Geotech — Wyndham Echo Hotel — Plano Gateway — 12-5-22
MCP Supplemental Conditions.2021
Addenda
None at this time.