Bid Due Date | March 10, 2021 2:00 PM
Project Description
The project consists of a new 64,748 sf two story steel framed building.
The work includes site demolition, earthwork, drilled piers, unit pavers, site concrete, site utilities, landscaping & irrigation, cast-in-place concrete, unit masonry, stone, structural steel, glazed metal railings, decorative metals, architectural woodwork, waterproofing, air barriers, metal roof panels, metal wall panels, built up asphalt roofing, fireproofing, joint sealants, doors/frames/hardware, side folding grilles, folding aluminum door & frame systems, aluminum entrances & storefront, curtain wall, pass windows, gypsum board assemblies, tile, acoustical ceilings linear metal ceilings, suspended wood ceilings, resilient flooring & carpet, resinous matrix terrazzo flooring, access flooring, acoustic room components, painting, visual display boards, toilet compartments and accessories, upward folding acoustical panel partitions, metal corner guards, defibrillator cabinets, fire protection specialties, storage shelving, exterior clocks, flagpoles, library self check system, facility fall protection, roller window shades, upholstered seating, fountain, traction elevators, fire sprinkler, plumbing, HVAC, electrical, communications, and fire alarm.
Location
Topeka, KansasPlans
WU School of Law Bid Drawings – Volume 1
WU School of Law Bid Drawings – Volume 2
Specifications
RFP 21014 SoL General Contractor
WU School of Law Bid Project Manual
General Information
Bid Invitation Washburn University School of Law Building
MCP Build, Inc. Supplementary-Conditions 1.18.19