Skip to content

Reserves at Mill Farm Phase 2 – Pella, IA

Bid Due Date | May 30, 2019 12:00 PM


Project Description

This project is new construction consisting of 3-16 unit wood framed apartment buildings. ALL scopes of work are needed. They include but are not limited to Cast in place concrete, 4″ masonry veneer, Metal railings, trash enclosure steel, Rough carpentry materials and labor, Finish carpentry labor, Wire shelving, Asphalt shingle roofing, Gutters and downspouts, batt and blow insulation, joint sealants, Doors, Door hardware, Vinyl windows, Mirrors, Storm doors, Drywall, Painting, Floor coverings, restroom accessories, postal specialties, signage, residential appliances, residential casework, louvre blinds, playground equipment, Fire sprinklers, Plumbing, HVAC, Electrical. Site concrete, ADA signage and Lot striping.


Location

Pella, IA

Plans

Combined Check set

 

General Information

Geotechnical-Report-for-Reserves-at-Mill-Farms-Phase-2-Terracon-Project-08195102-01
Mill-Farms-Design-Elements
HVAC Commissioning Checklist v9
HVAC Design Report v9
Rater Field Checklist v9
Water Management v9
Recommended Energy Items for Contractor Contracts
MCP Build, Inc. Supplementary-Conditions 1.18.19

 

Specifications

Pella-IA-specifications-5-23-2019


Addenda

Mill-Farm-Phase-II-Pella-Adden.-1
Mill-Farm-Phase-II-Pella-Adden-2
Mill-Farm-Phase-II-Pella-Adden-3

 

ASI

2925_ASI #1 (7-8-19)
2925_ASI #2 (7-9-19)