Lee Lofts Phase 2 – Salina, KS

Bid Due Date | March 9, 2023 2:00 PM


Project Description

Existing 5-story heavy timber frame and masonry building. Will be restored into a 50-unit apartment building. Will require selective demolition, site, concrete, concrete infill, lightweight floor leveling, gypcrete, masonry restoration, masonry infills, structural steel, steel fabrications, rough carpentry, finish carpentry, single-ply roofing, building insulation, replacement windows, storefront glass systems, window restoration, mirrors, wood doors, frames, hardware, HM frames and doors, drywall, flooring, paint, restroom accessories, mailboxes, fire extinguishers, window coverings, residential appliances, residential casework, elevator, fire sprinkler, plumbing, HVAC, Electrical, Fire Alarm, low voltage, selective site demolition, landscape, play scape, lot striping and signage, aluminum fencing, and site utilities.


Location

Salina, KS

Plans

ARCH-PERMIT-BID-SET-2-15
STRUCTURAL_Lee-Lofts-Permit-Set-2-15-23
CIVIL_Lee-Lofts_-Permit-Set-2-15-23
MEP_Lee-Lofts-Permit-Set-2-15-23
3280CS_Survey_Lee-Lofts_Lot-Split-2-7-23

 

Specifications

FINAL-SPECIFICATIONS-2-15-22

 

General Information

Section 3 ITB Lee Lofts
Lee Lofts PH 2 ITB
MCP Supplemental Conditions.2021

 

Addenda

Lee-Lofts-Addendum-1-3-6-23

 

Pre-Bid/Job Walk Information

A pre-bid meeting and job walk will be held March 1st, 2023 at 10:00 AM CST. This is strongly encouraged, but not mandatory.