Bid Due Date | August 20, 2020 2:00 PM
Project Description
The project consists of a 15,785 sf addition and a renovation to the existing building.
The work includes structure demolition, selective demolition, site demolition, earthwork, site concrete, asphalt paving, striping, chain link fencing, site utilities, cast-in-place concrete, unit masonry, miscellaneous steel, finish carpentry, sheet metal, joint sealants, doors/frames/hardware, aluminum entrances & storefront, insulated translucent fiberglass sandwich panel wall system, gypsum board assemblies, tile, acoustical ceilings, resilient flooring & carpet, painting, visual display surfaces, signage, toilet accessories, fire protection specialties, metal lockers, flagpoles, roller window shades, metal building construction, fire sprinklers, plumbing, HVAC, and electrical.
Location
Topeka, KansasPlans
Gage Subarea Modification Combined Plans
Specifications
Gage Subarea Modification Combined Specifications Volume 1
Gage Subarea Modification Combined Specifications Volume 2
General Information
Bid Invitation Gage Subarea Modification
MCP Build, Inc. Supplementary-Conditions 1.18.19