Bid Due Date | September 29, 2020 2:00 PM


Project Description

The project consists of a new 10,650 sf metal building.

The work includes site demolition, earthwork, concrete paving, site concrete, landscaping & irrigation, site utilities, cast-in-place concrete, unit masonry, precast concrete caps, miscellaneous and structural steel, cold formed steel trusses, wood I-joists, architectural woodwork, FRP, bituminous dampproofing, waterproofing, water repellents, insulation, fluid applied air barrier, sheet metal, joint sealants, doors/frames/hardware, overhead doors, aluminum entrances & storefront, composite windows, automatic door operators, gypsum board assemblies, tile, acoustical ceilings, resilient flooring and carpet, painting, fire protection specialties, signage, toilet and bath accessories, shower doors, corner guards, flagpoles, residential appliances, laundry equipment, window blinds, metal building systems, fire sprinklers, plumbing, HVAC, fire alarm, and electrical.


Location

Eaton, Colorado

Plans

Galeton Fire Station #2 Combined Plans

 

Specifications

GaletonFS2_PM_2020-08-15

 

General Information

Bid Invitation Galeton Fire Station #2.xlsx

MCP Build, Inc. Supplementary-Conditions 1.18.19

 

Addenda

CMGC RFP_ SPECIFICATIONS REVISED_ 8.28.20

FC08963-125 GEO INV_Galeton Fire Station

FC08963-130 OWTS DESIGN – Galeton Fire Station

Q&A Document 1