Advisors Excel Strip Mall Remodel

Bid Due Date | September 22, 2022 2:00 PM


Project Description

The project consists of a 47,332 sf remodel to the existing building with associated sitework.

The work includes asbestos abatement, selective demolition, site demolition, earthwork, asphalt paving, site concrete, site utilities, landscaping & irrigation, cast-in-place concrete, unit masonry, structural steel, architectural woodwork, fiber cement siding, stucco, EIFS, joint sealants, doors/frames/hardware, aluminum entrances & storefront, gypsum board assemblies, tile, acoustical ceilings, resilient flooring & carpet, painting & wallcovering, toilet compartments & accessories, fire protection specialties, visual display boards, signage, window treatments, plumbing (negotiated), HVAC, (negotiated), and electrical (negotiated).


Location

Topeka, Kansas

Plans

210387 AE Gage Center Strip Mall_Combined SET

 

Specifications

1 AE Strip Mall – Project Manual Combined

Gage Center Asb Insp

 

General Information

Bid Invitation Advisors Excel Strip Mall Remodel

MCP Supplemental Conditions.2021

 

Addenda

AE ADD-1, REV-1 (1)

AE ADD-2 – Signage, Irrigation, gen clarifications

AE ADD-3